Project: Rowan Court Client: Jones Lang LaSalle Value: £46,000

jones-lang-lasalle-logoProject

Decoration:- To erect full scaffold to front, side and corridor to enable access for decoration and repairs to previously painted walls and windows. We carried out repairs and decoration to all timber including shopfronts.

Roof Repairs:- To de-gas the air conditioning units on the flat roof at the rear of the property. Disconnect and place in a safe position. Remove from site obsolete plant. Supply and lay Kemperol Liquid Roofing System to all areas. Re-site air conditioning equipment, connect and commission.

Elements

  • Repairs to windows and rendering
  • Redecoration of external walls and woodwork
  • Decommission air conditioning units
  • Remove obsolete and reinstate
  • Kemperol to flat roof